MENU

The PNOC Renewables Corporation and the Philippine International Convention Center (PICC) officials joined together in a momentous occasion before the year ends to inaugurate the Solar PV Rooftop Project for the PICC. Held on 28 December 2018 at the Summit Hall Delegation Building, the event is one of the highlights of PNOC RC’s energy efficiency program for government agencies, and their most significant accomplishment in terms of scale. This is the largest rooftop solar PV system that PNOC RC has installed as of date, showcasing it on the world-class facility for global conventions and exhibits of the PICC.

A capacity of 1,050kWp, or more than 1 Megawatt of solar PV was installed on the Reception and Plenary Hall (600kWp) , Secretariat Hall (210 kWp) and Delegation Hall 240 kWp). The said installations shall be operated and maintained by PNOC RC within the agreed cooperation period. The solar PV system will provide PICC with clean solar energy and shall displace around 1,200,000 kWh annually of electricity from the grid. Apart from the electricity savings, it would offset more than one thousand metric tons of carbon emissions from fossil fuel energy sources. The installation shall be turned over to PICC after the agreed period of operation and maintenance.

The event was attended by high ranking officials from both government organizations. This shows that with cooperation between government entities, we could realize energy efficiency projects of this magnitude. And with full support from government, similar initiatives could be implemented nationwide.

Invitation to Apply for Eligibility and to Submit a Proposal 2022

PNOC Renewables Corporation, through its Joint Venture Selection Committee (JVSC), is inviting interested parties to apply for eligibility for the following project:

Read more ...

Invitation to Bid Selection of a Joint Venture Partner for the ARIS. 3+611 Hydropower Project

Bid Bulletin No. 1

Invitation to Bid D-20-001 Sale of Various Unserviceable Assets

INVITATION TO BID

The PNOC Renewables Corporation through its Disposal Committee hereby invites all interested parties to participate in the public bidding for the D-20-001: Sale of Various Unserviceable Assets on an “As-Is-Where-Is” basis as indicated below:

Where: PNOC Renewables Corporation with office address at G/F PNOC Bldg. V, Energy Center, Rizal Drive, Bonifacio Global City, Taguig City.

D-20-001: Sale of Various Unserviceable Assets: Php856,450.00

Inspection of Items for Sale:

Taguig City - Jan. 12, 2022, 10:00AM

Bauan, Batangas - Jan. 13, 2022, 10:00 AM

Rizal, Nueva Ecija - Jan. 14, 2022, 11:00AM

Deadline of Submission: 26 January 2022, 1:30PM

 Bidding documents shall be accessible to all interested parties at PNOC RC’s website (www.pnoc-rc.com.ph). Should there be any matter that needs clarification, please feel free to call us at Trunk Line No. (02) 840-3080 loc. 8893 or Direct telefax no. (02) 812-0991 and look for Maynard Lee E. Gomintong or send us an email at This email address is being protected from spambots. You need JavaScript enabled to view it..

Invitation to Bid D-20-001 Sale of Various Unserviceable Assets

INVITATION TO BID

The PNOC Renewables Corporation through its Disposal Committee hereby invites all interested parties to participate in the public bidding for the D-20-001: Sale of Various Unserviceable Assets on an “As-Is-Where-Is” basis as indicated below:

Where: PNOC Renewables Corporation with office address at G/F PNOC Bldg. V, Energy Center, Rizal Drive, Bonifacio Global City, Taguig City.

D-20-001: Sale of Various Unserviceable Assets: Php882,150.00

Inspection of Items for Sale 15 November 2021 - BGC, Taguig City
Schedule:

16 November 2021 - Bauan, Batangas

17 November 2021 - Rizal, Nueva Ecija

Deadline of Submission: 24 November 2021, 1:00PM

 Bidding documents shall be accessible to all interested parties at PNOC RC’s website (www.pnoc-rc.com.ph). Should there be any matter that needs clarification, please feel free to call us at Trunk Line No. (02) 840-3080 loc. 8893 or Direct telefax no. (02) 812-0991 and look for Maynard Lee E. Gomintong or send us an email at This email address is being protected from spambots. You need JavaScript enabled to view it..

Advisory

Consistent with the Memorandum Circular signed by the Executive Secretary and issued on 16 March 2020 which provides for the Enhanced Community Quarantine over Luzon and further guidelines for the management of the Corona Virus Disease 2019, PNOC Renewables Corporation shall implement a WORK FROM HOME scheme to safeguard the health and well-being of our employees.

This work arrangement shall take effect from 17 MARCH 2020 to 13 APRIL 2020 and shall remain in full force and effect until such time that the Enhanced Community Quarantine over Luzon has been lifted.

We advise our partners and stakeholders to coordinate with us using online and digital collaboration platforms.

Important announcements shall be posted in our website www.pnoc-rc.com.ph. Inquiries and official correspondences may be sent to This email address is being protected from spambots. You need JavaScript enabled to view it..

Thank you for your utmost understanding.

COVID-19 Bulletin

COVID-19 Advisory No. 11

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 10

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 9

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 8

PNOC RC would like to inform our colleagues in the Energy Compound that we have two (2) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 7

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...