MENU

Manila – PNOC RC continues to fortify its thrust to promote the use of renewable energy and energy efficiency projects in government agencies as it executed a Memorandum of Agreement (MOA) with the Philippine International Convention Center (PICC) for the installation of a 1.2MWp Solar Photovoltaic (PV) facility on its buildings at the PICC Complex last 15 August: It is by far PNOC RC’s largest solar rooftop project on government buildings to date.

The said project shall be implemented in three (3) phases, the first phase of which comprises the rooftops of the Reception, Secretariat and Delegation buildings. The installation of the second and third phases is expected to be done in other PICC buildings by 2018.

In his speech during the MOA signing, PICC’s General Manager Atty. Renato B. Padilla mentioned that the said cooperation is “PICC’s way of supporting the government’s renewable energy program which promotes the development, utilization and commercialization of clean and green energy technology. We are grateful for this mutually beneficial partnership with PNOC RC”. The actualization of this project shows that more government agencies now share the vision of a cleaner, greener environment. PNOC RC is hopeful that this milestone paves way for more collaboration with other agencies in the government sector in pursuing the use of renewable energy towards an energy-efficient, mother nature-loving industry.

Invitation to Apply for Eligibility and to Submit a Proposal 2022

PNOC Renewables Corporation, through its Joint Venture Selection Committee (JVSC), is inviting interested parties to apply for eligibility for the following project:

Read more ...

Invitation to Bid Selection of a Joint Venture Partner for the ARIS. 3+611 Hydropower Project

Bid Bulletin No. 1

Invitation to Bid D-20-001 Sale of Various Unserviceable Assets

INVITATION TO BID

The PNOC Renewables Corporation through its Disposal Committee hereby invites all interested parties to participate in the public bidding for the D-20-001: Sale of Various Unserviceable Assets on an “As-Is-Where-Is” basis as indicated below:

Where: PNOC Renewables Corporation with office address at G/F PNOC Bldg. V, Energy Center, Rizal Drive, Bonifacio Global City, Taguig City.

D-20-001: Sale of Various Unserviceable Assets: Php856,450.00

Inspection of Items for Sale:

Taguig City - Jan. 12, 2022, 10:00AM

Bauan, Batangas - Jan. 13, 2022, 10:00 AM

Rizal, Nueva Ecija - Jan. 14, 2022, 11:00AM

Deadline of Submission: 26 January 2022, 1:30PM

 Bidding documents shall be accessible to all interested parties at PNOC RC’s website (www.pnoc-rc.com.ph). Should there be any matter that needs clarification, please feel free to call us at Trunk Line No. (02) 840-3080 loc. 8893 or Direct telefax no. (02) 812-0991 and look for Maynard Lee E. Gomintong or send us an email at This email address is being protected from spambots. You need JavaScript enabled to view it..

Invitation to Bid D-20-001 Sale of Various Unserviceable Assets

INVITATION TO BID

The PNOC Renewables Corporation through its Disposal Committee hereby invites all interested parties to participate in the public bidding for the D-20-001: Sale of Various Unserviceable Assets on an “As-Is-Where-Is” basis as indicated below:

Where: PNOC Renewables Corporation with office address at G/F PNOC Bldg. V, Energy Center, Rizal Drive, Bonifacio Global City, Taguig City.

D-20-001: Sale of Various Unserviceable Assets: Php882,150.00

Inspection of Items for Sale 15 November 2021 - BGC, Taguig City
Schedule:

16 November 2021 - Bauan, Batangas

17 November 2021 - Rizal, Nueva Ecija

Deadline of Submission: 24 November 2021, 1:00PM

 Bidding documents shall be accessible to all interested parties at PNOC RC’s website (www.pnoc-rc.com.ph). Should there be any matter that needs clarification, please feel free to call us at Trunk Line No. (02) 840-3080 loc. 8893 or Direct telefax no. (02) 812-0991 and look for Maynard Lee E. Gomintong or send us an email at This email address is being protected from spambots. You need JavaScript enabled to view it..

Advisory

Consistent with the Memorandum Circular signed by the Executive Secretary and issued on 16 March 2020 which provides for the Enhanced Community Quarantine over Luzon and further guidelines for the management of the Corona Virus Disease 2019, PNOC Renewables Corporation shall implement a WORK FROM HOME scheme to safeguard the health and well-being of our employees.

This work arrangement shall take effect from 17 MARCH 2020 to 13 APRIL 2020 and shall remain in full force and effect until such time that the Enhanced Community Quarantine over Luzon has been lifted.

We advise our partners and stakeholders to coordinate with us using online and digital collaboration platforms.

Important announcements shall be posted in our website www.pnoc-rc.com.ph. Inquiries and official correspondences may be sent to This email address is being protected from spambots. You need JavaScript enabled to view it..

Thank you for your utmost understanding.

COVID-19 Bulletin

COVID-19 Advisory No. 11

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 10

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 9

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 8

PNOC RC would like to inform our colleagues in the Energy Compound that we have two (2) new confirmed COVID-19 case.

Read more ...

COVID-19 Advisory No. 7

PNOC RC would like to inform our colleagues in the Energy Compound that we have one (1) new confirmed COVID-19 case.

Read more ...