|
HYDRO POWER |
| |
|
Pre Development Stage |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
.jpg) |
|
|
. |
|
Sicopong, Negros Oriental 17.8 MW
(HSC 2009-10-041) |
|
. |
|
Project Location: Sta.
Catalina,
Negros Oriental |
|
|
|
Project Description: |
|
|
|
The Sicopong Hydropower Project is a run-of-the-river type using the
potential of the Sicopong River for power generation. Based on the
proposed design scheme, major structures of the project will be
located in three Municipalities of Negros Oriental, namely,
Pamplona, Sta. Catalina and Tanjay City. The proposed diversion
weir will be located in Brgy. Calicanan in Pamplona while the
powerhouse in Brgy. Amio, Sta. Catalina and portion of the headrace
will pass through the area of Tanjay City.
The project has a potential capacity of 17.8 MW and is estimated to
generate about 30.62 GWh of electricity per year.
The project will be connected to the Visayas grid. Power generated
will be sold to the commercial and industrial consumers in the
island of Negros and other islands connected to the Visayas grid. |
|
|
|
Project Status as of June 2011: |
|
|
|
The Asian Development Bank (ADB) engaged the services of Snowy
Mountain Engineering Corporation (SMEC) for the conduct of
pre-feasibility study of Sicopong Hydro Project after approving the
funding for the same. However, after completing the said activity,
SMEC has not yet submitted the pre-feasibility study final report to
PNOC RC. At present PNOC RC is looking for a potential partner for
the conduct of a full feasibility study of Sicopong project. |
|
|
|
|
|
View Larger Map
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
sadasdsad |
|