|    CAREERS    |    FAQS    |    INVEST    |    PRIVACY POLICY    |   . .

 
 

HYDRO POWER

 

   Pre Development Stage

 

 
 
 
 
 
.

Sicopong, Negros Oriental 17.8 MW (HSC 2009-10-041)

.
Project Location: Sta. Catalina, Negros Oriental
 
Project Description:
 

The Sicopong Hydropower Project is a run-of-the-river type using the potential of the Sicopong River for power generation. Based on the proposed design scheme, major structures of the project will be located in three Municipalities of Negros Oriental, namely, Pamplona, Sta. Catalina and Tanjay City.  The proposed diversion weir will be located in Brgy. Calicanan in Pamplona while the powerhouse in Brgy. Amio, Sta. Catalina and portion of the headrace will pass through the area of Tanjay City.

The project has a potential capacity of 17.8 MW and is estimated to generate about 30.62 GWh of electricity per year.

The project will be connected to the Visayas grid.  Power generated will be sold to the commercial and industrial consumers in the island of Negros and other islands connected to the Visayas grid.
 
Project Status as of June 2011:
 
The Asian Development Bank (ADB) engaged the services of Snowy Mountain Engineering Corporation (SMEC) for the conduct of pre-feasibility study of Sicopong Hydro Project after approving the funding for the same.  However, after completing the said activity, SMEC has not yet submitted the pre-feasibility study final report to PNOC RC. At present PNOC RC is looking for a potential partner for the conduct of a full feasibility study of Sicopong project.
 
 


View Larger Map

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
sadasdsad
 
Home About Us Programs & Projects Products & Services News & Events Bids & Notices Inquiries Contact Us
    Careers FAQs Invest Privacy Policy    
© 2009 Philippine National Oil Company - Renewables Corporation. All rights reserved.