Siaton, Negros Oriental 5.4 MW
(HSC 2009-10-040) |
|
. |
|
Project Location:
Siaton, Negros Oriental |
|
|
|
Project Description: |
|
|
|
The Siaton Hydropower Project is a run-or-the-river type hydropower
development along Siaton River. It will be located in Barangay
Apoloy, Siaton, Negros Oriental.
The project has a potential capacity of 5.4 MW and is estimated to
generate about 18.4 GWh of electricity per year.
The proposed project will be connected to the Visayas grid. Power
generated will be sold to the local electric cooperatives and
industries. This shall benefit households, institutions, commercial
and industrial consumers of the island of Negros and other islands
in the Visayas. |
|
|
|
Project Status as of June 2011: |
|
|
|
The Siaton and Okoy projects were bundled into one consultancy
contract for the conduct of feasibility study and this was awarded
to Engineering & Development Corporation of the Philippines (EDCOP).
PNOC RC together with EDCOP conducted socio-economic survey and
information/education campaign with the local government units.
EDCOP completed the initial water flow measurement and presented the
peaking and non-peaking design scheme for both Siaton and Okoy.
PNOC RC and EDCOP are currently undertaking preliminary activities,
like IEC, in line with the preparation for Environment Impact
Assessments of the project. |
|
|
|
|
|